• Login
    View Item 
    •   Repository Home
    • Staff Publications
    • School of Business & Economics
    • View Item
    •   Repository Home
    • Staff Publications
    • School of Business & Economics
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Influence of Ambiguity on Success of Public Infrastructural Megaprojects in Kenya

    Thumbnail
    View/Open
    1331-ArticleText-2481-2-10-20180327.pdf (455.5Kb)
    Date
    2018
    Author
    Omonyo, Austin Baraza
    Gakure, Roselyn
    Otieno, Romanus Odhiambo
    Metadata
    Show full item record
    Abstract
    The objective of this study was to investigate the influence of ambiguity on success of public infrastructural megaprojects in Kenya. The need for this study arose from the thesis that ambiguity is a key cause of complexity that results in infrastructural megaprojects being delivered over budget, behind schedule, with benefit shortfalls, over and over again. The study was designed as multiple-method research based on virtual constructionist ontology recognizing that complexity is the mid-point between order and disorder. A crosssectional census survey of completed public infrastructural megaprojects was conducted using two interlinked questionnaires. Quantitative data was analyzed using descriptive and inferential statistics while qualitative data was analyzed using expert judgment, scenario mapping and retrospective sense-making. The projects surveyed majorly utilized fixed price contracts with the outcome of increased delivery within budget than within schedule. The results showed that ambiguity had significant negative influence on process and overall success of public infrastructural megaprojects but had no significant relationship with product and organizational success. Projects in which the client assumed responsibility for cost and schedule risk had higher chances of meeting both cost and schedule objectives. In order to manage the negative effects of ambiguity, we recommend a new perspective to contract design of public infrastructural megaprojects based on complexity science, blending both outcome and behavior-based contracts. Such contracts should ensure that, in the face of ambiguity, the contractors are able to act in the best interest of their clients and that the clients have access to quality Project Management Information Systems.
    URI
    http://repository.must.ac.ke/handle/123456789/1231
    Collections
    • School of Business & Economics [141]

    MUST Repository copyright © 2002-2016  MUST Repository
    Contact Us | Send Feedback
    Theme by 
    MUST Repository
     

     

    Browse

    All of the RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    MUST Repository copyright © 2002-2016  MUST Repository
    Contact Us | Send Feedback
    Theme by 
    MUST Repository